image
Sustainability
Environmental Protection
Tung Pei has been established since 1966 under technical co-operation with NTN Corporation, Japan.
image
Solar wind power generation system
TPI Zhongli plant's solar and wind power generator have been working together since 12/3. Although the electricity generated is little when compared to the electricity required for the whole plant's operation, it is TPI's starting point for the developme
image
Grinding debris curing systems
Grinding fluid recycled and reused 100,000kg/year
image
Air Compressor Hear Recovery System
The Air Compressor Hear Recovery System in our Zhongli plant's Precision Bearing building officially started running during November, 2012. Its main function is to reduce gas consumption, at an estimate of 41495kg/year.
image
TPI Dormitory Solar Powered Hot Water System
Collect the sun's heat and convert cold water to hot water, using a set of U-shaped heat pipe vacuum collector with 12 tubes. Currently the dormitory uses 36 sets.
image
Heat-Treatment Quenching Oil's Waste Heat ORC System
TPI’s 20kW Quenching Oil’s Waste Heat ORC (Organic Rankine Cycle) System not only increases energy efficiency but also reduces the cost and greenhouse gas emission. It is expected to generate 182 MWh/year and to reduce 113 metric tons of carbon
Designed by:iware 網頁設計